An interesting read and a heads up to designers, ship operators/owners and Engineering crew onboard ship.
Canadian Marine Transportation Safety Investigation Report M18P0014 – Engine room fire in Container vessel January 2018

Executive summary
On 31 January 2018, a fire broke out in the engine room of the container vessel MOL Prestige while the vessel was at sea 146 nautical miles south-southwest of Haida Gwaii, British Columbia (BC). There were 22 crew and 1 supernumerary on board at the time. The fire was eventually extinguished. Five of the crew members were seriously injured. A Royal Canadian Air Force helicopter evacuated 2 of the crew members to hospital in the Village of Queen Charlotte, BC. The Canadian Coast Guard ship Sir Wilfrid Laurier assisted until a salvage tug arrived and towed the disabled vessel to Seattle, Washington, United States.
The investigation identified a number of safety deficiencies described below.
Engine room maintenance and practices
The investigation identified maintenance-related issues in the engine room of the MOL Prestige. The level indicators on the settling and service tanks were inoperative and the engineers had to climb onto the tanks and unbolt a blind flange in order to sound the tank. Over time, the blind flange was left off the level indicator pipe for the settling tank. As well, at some point, the high-temperature alarm on the settling tank had been set at 30 °C above the safe maximum temperature. This meant that any water entering the settling tank might be subject to frothover because oil in the tank above 100 °C would cause any water in the tank, or added to the tank, to boil instantly. The high temperature in the settling tank, in conjunction with the open level indicator pipe on the settling tank, created unsafe conditions that allowed frothover to expunge oil and fumes out of the tank and the steam explosion, which resulted in the fire.
The responsibility for ensuring that equipment in the engine room is maintained safely and that engine room practices are safe is shared by vessel management and crew. In the case of the MOL Prestige, the year before the occurrence, the technical management of the vessel had changed and a new reporting system had been introduced. During this period of change, issues that had been identified by the engine room crew went unaddressed and, as a result, because the engine room equipment was not maintained as required by company procedures and the manufacturer’s specification, some of the engine room equipment presented hazards.
If those responsible for ensuring an engine room is maintained sufficiently do not work together to mitigate hazards (leaks, broken equipment, adaptations) in a timely and efficient manner, there is a risk that engine room equipment will fail, leading to accidents.

Egress and evacuation from engine room
Timely egress and evacuation from an engine room is essential in the event of an engine room fire. In this occurrence, the engine room personnel met in the engine control room as the fire began developing, but then became trapped once the fire escalated. A number of factors combined to make egress from the engine control room and subsequent evacuation efforts challenging, placing crew members at risk during the emergency response and prolonging the time that elapsed before egress was possible. During this delay the fire continued to burn unabated.
Cargo vessels constructed after 01 January 2016 must meet regulations set out by The International Convention of Safety of Life at Sea (SOLAS) with respect to escape arrangements from engine control rooms. Although not required for cargo vessels such as the MOL Prestige, which was constructed prior to 01 January 2016, an evacuation analysis of the engine room may have prompted an evaluation of the necessary means of escape from the engine control room, including the placement of the emergency escape breathing devices, the markings required, and the visibility of the exit doors.
If the owners/operators of cargo vessels constructed before 01 January 2016 do not evaluate evacuation routes to ensure that escape arrangements from engine control rooms provide an equivalent level of safety to that required by the current SOLAS regulations, there is a risk that the means of escape provided will be insufficient to support safe and timely egress to a safe position outside machinery spaces.
Emergency preparedness and drills
To respond effectively to a fire, crew must be trained in emergency procedures and must practise using emergency equipment. Drills that are realistic and include varying scenarios help to increase a crew’s preparedness and effectiveness in responding to a fire. The crew on the MOL Prestige had regularly practised drills related to fire in the engine room and rescue from enclosed space, but not all crew members had had the opportunity to practise donning firefighting equipment, and the drills involving fire had not been conducted with realistic scenarios involving unexpected events. The investigation found that the crew had not had the opportunity to practice all of their designated duties and related procedures during drills.
If emergency drills are not routinely practised and evaluated with all of the crew members’ designated duties, or do not include realistic scenarios, there is a risk that the crew will be unprepared in an emergency.
Maintenance of fixed fire suppression systems
The MOL Prestige was fitted with a fixed fire suppression system, but it had leaks in safety-critical units and hoses that went undetected until the system was inspected after the fire. The regulations specify that the system must be able to withstand a minimum bursting pressure and be subjected to an initial pressure test at the time of construction. There is also a requirement to hydraulically test all CO2 cylinders at regular intervals. However, this principle is not extended to include the distribution system, and there is no requirement for a pressure test to be carried out periodically during the life of the vessel. Inspection and testing regimes for CO2 systems must, therefore, contain provisions that will help ensure their continued integrity.
If critical on-board firefighting appliances, such as a fixed fire suppression system, are not maintained according to the manufacturer’s specifications and regulatory requirements, there is a risk that such systems will not function as intended in an emergency.
Safety management
The MOL Prestige had an audited safety management system that included procedures for hazard identification, for checks to engine room equipment, and for record keeping, among other things, but some of the safety issues identified during the investigation were not identified during audits or routine checks. Furthermore, none of the methods for hazard identification provided for by the vessel’s SMS were successful in leading to the timely correction of these issues.
If companies do not establish an effective SMS that encourages crew to identify hazards and that supports the crew in developing safe and timely mitigations, there is a risk that hazardous operating conditions will remain.
Read the online report here: https://www.tsb.gc.ca/eng/rapports-reports/marine/2018/m18p0014/m18p0014.html
Download and read the full report here: https://bit.ly/3iOWXYk
SAIMENA Durban Branch AGM 2026 – 25 Feb 2026
Good day SAIMENA Durban Branch members. Please diarise the 25th Feb 2026 1730 for the Durban Branch AGM. Hosted at Royal Natal Yacht Club in the Fore Deck. If you you cannot attend there was a proxy form sent out by email. Let me know if you need one privately. Also...
SAIMENA National AGM on 19 Feb 2026
Dear SAIMENA member All SAIMENA members are advised of the National Council AGM for 2026 to be held on 19 February 2026 at 1600 This will be held via an online platform, login details will be provided for you to attend. Please confirm your RSVP to attend the...
SAIMENA Cape Branch Meeting and Presentation 25 Sep 2025
The SAIMENA Cape Branch had a great meeting on the 25th Sep with a presentation by Kevin Watson of SAIMENA and Mbulelo Hlalukana of ECSA on the subject of “The Impact of the Identification of Engineering Work by ECSA on the Maritime Industry”. It was well received by...
SAIMENA Cape Branch Meeting – 25 September 2025: Impact of the Identification of Engineering Work by ECSA on the Maritime Industry
The SAIMENA Cape Branch invites you to attend the following meeting: Title: Impact of the Identification of Engineering Work by ECSA on the Maritime Industry Speaker: Kevin Watson (SAIMENA) and ECSA Representative Company: SAIMENA and ECSA Place: Survival Centre,...
SAIMENA Cape Branch Meeting and Presentation 28 Aug 2025
The SAIMENA Cape Branch had a great meeting on the 28th Aug with a presentation by Willem Nel of Ikapa Consortium NDT on the subject of "Defect Findings on 3D printed steel alloy parts for the marine industry". It was well received by the good turnout, 23 attending...
SAIMENA 50th Gala Dinner
Report from Maritime Review Africa MRA Online / Monday, July 14, 2025 Celebrating 50 years of commitment to technical advancement SAIMENA celebrates in Cape Town and Durban SOUTH AFRICA: The South African Institute for Marine Engineers and Naval Architects (SAIMENA)...
Sailors’ Society – Cadet Newsletter 2025
This will contain relevant and useful information for Cadets in the maritime. Cadet Newsletter 2025 This is a must for anyone about to embark on a career in maritime. This year, our global conferences especially for cadets, ratings and trainees will be delving into...
SAMSA Stakeholder Engagement: Draft Regulations for Fishing Vessels
The Minister of Transport intends, in terms of section 356(2)(a) of the Merchant Shipping Act, 1951 (Act No. 57 of 1951) and on the recommendation of the South African Maritime Safety Authority to promulgate Draft Merchant Shipping (Construction and Equipment on...
SAIMENA CAPE BRANCH: NOTICE OF BRANCH MEETING 26 June 2025
The SAIMENA Cape Branch invites you to attend the following meeting: Presentation: Composites in the Marine Industry Composites are increasingly being used in design, manufacturing, and repairs in various industries. One particular industry that is seeing the use of...
New research chair at Stellenbosch University to impact the blue economy
March 19, 2025News Prof Annie Bekker from Stellenbosch University’s (SU’s) Department of Mechanical and Mechatronic Engineering has been awarded the DSI/NRF-SAIMI SARChI Research Chair in Naval Architecture and Design. This new SARChI Chair is focused on catalysing...

https://youtu.be/kMlOwfNyzC0?list=UUoQbQE-aEhVBywNRB-XsHOQ